(Sede Parco Cinque Terre, 08 Feb 22) The section remains closed to allow the reconstruction of the drystone wall collapsed near the access of the path Verde Azzurro (SVA), Vernazza side. The restoration of the wall is the responsibility of the owner of the land above the trail.
The works on the collapsed drystone wall are expected to be finished by the beginning of March, the part of the SVA path from Vernazza to Monterosso remains closed by order of the respective municipalities.
For updates on the accessibility of the path network please check link mappe.parconazionale5terre.it